Skip to main content
Active

Replacement of damaged CO gas pipeline in existing pipeline corridor under the control of ODPL department

Office: Burnpur

AI Executive Summary

Replacement of damaged CO gas pipeline in existing pipeline corridor under the control of ODPL department

Key Dates & Quantities

Bid Start Date/Time

08 Apr 2026, 04:23 pm

Bid End Date/Time

23 Apr 2026, 04:30 pm

Bid Opening Date/Time

23 Apr 2026, 05:00 pm

Bid Offer Validity / Contract Period

1 Year(s)

Total Quantity

1

Pre-Bid Meeting Date

Not Applicable

Tender Details

Item Category

Custom Bid for Services - Replacement of damaged CO gas pipeline in existing pipeline corridor under the control of ODPL department

Estimated Bid Value

₹0

ePBG Detail

0%

Bid Type

Services

Is High Value

No

Qualifications & Experience

Years of Past Experience (with Govt.)

0 Year(s)

Project / Similar Work Experience Required

Not Specified

Minimum Average Annual Turnover

₹6 Lakhs

Additional Terms & Conditions

Refer to Tender Document (ATC section in PDF)

Preferences & Relaxations

MSE Preference

Applicable

MII Preference

Applicable

Startup Relaxation

Yes | Partial | Turn over value - 5.1 (in lakhs)

MSE Turnover/Exp

Yes | Partial | Turn over value - 5.1 (in lakhs)

Documents Required from Seller

• Experience Criteria • Bidder Turnover • Certificate (Requested in ATC) • Additional Doc 1 (Requested in ATC) • Additional Doc 2 (Requested in ATC)

Other Details

Consignees / Delivery Locations

1 Location(s)

Delivery State / City

West Bengal, Burnpur

GeMARPTS Result

Not Specified

Ready to Proceed?

GeM Bid Document ID
Tender Document
EMD AmountNo EMD
Ends On23 Apr 2026, 04:30 pm

Pro: Deep AI Analysis

Get bid worthiness score, eligibility checklist, winning tips, and time-to-prepare estimate for this tender.

Upgrade to Pro

Summary information is processed by AI. Always refer to the official tender document for accurate dates, requirements, and legal specifics before bidding.

Replacement of damaged CO gas pipeline in existing pipeline corridor under the control of ODPL department | GeMTenders.org