Supply of SWITCH PLATE FOR COACHES as per item 1 of attached specification document,Supply of SWITCH PLATE ASSEMBLY FOR COACHES as per item 2 of attached specification document,Supply of SWITCH PLATE ASSEMBLY as per item 3 of attached specification document,Supply of MCB for 5 KVA transformers as per item 4 of attached specification document,Supply of LED Driver as per item 5 of attched specification document,Supply of Bottle cooler of 90 liters capacity as per item 6 of attched specification document,Supply of MCB for Power Factor Correction of Compressor as peritem 7 of attached specification document,Supply of 13 PIN UIC coupler plug assembly as per item 8 of attched specification document,Supply of Miniature Circuit Breaker as per item 9 of attached specificaiton document,Supply of MCB for RBC cum EBC as per item 10 of attched specification document,Supply of MCB for mobile as per item 11 of attched specificaiton document
AI Executive Summary
Supply of SWITCH PLATE FOR COACHES for Indian Railways
Key Dates & Quantities
Bid Start Date/Time
29 Mar 2026, 04:53 am
Bid End Date/Time
20 Apr 2026, 03:30 pm
Bid Opening Date/Time
20 Apr 2026, 04:00 pm
Bid Offer Validity / Contract Period
60 Days
Total Quantity
1554
Pre-Bid Meeting Date
Not Applicable
Tender Details
Item Category
Supply of SWITCH PLATE FOR COACHES as per item 1 of attached specification document,Supply of SWITCH PLATE ASSEMBLY FOR COACHES as per item 2 of attached specification document,Supply of SWITCH PLATE ASSEMBLY as per item 3 of attached specification document,Supply of MCB for 5 KVA transformers as per item 4 of attached specification document,Supply of LED Driver as per item 5 of attched specification document,Supply of Bottle cooler of 90 liters capacity as per item 6 of attched specification document,Supply of MCB for Power Factor Correction of Compressor as peritem 7 of attached specification document,Supply of 13 PIN UIC coupler plug assembly as per item 8 of attched specification document,Supply of Miniature Circuit Breaker as per item 9 of attached specificaiton document,Supply of MCB for RBC cum EBC as per item 10 of attched specification document,Supply of MCB for mobile as per item 11 of attched specificaiton document
Estimated Bid Value
₹0
ePBG Detail
0%
Bid Type
Goods
Is High Value
No
Qualifications & Experience
Years of Past Experience (with Govt.)
3 Year(s)
Project / Similar Work Experience Required
Not Specified
Minimum Average Annual Turnover
₹0 Lakhs
Additional Terms & Conditions
Refer to Tender Document (ATC section in PDF)
Preferences & Relaxations
MSE Preference
Applicable
MII Preference
Not Applicable
Startup Relaxation
Yes / Yes
MSE Turnover/Exp
Yes / Yes
Documents Required from Seller
• Experience Criteria • Past Performance • Bidder Turnover • Certificate (Requested in ATC) • Additional Doc 1 (Requested in ATC) • Additional Doc 2 (Requested in ATC)
Other Details
Consignees / Delivery Locations
1 Location(s)
Delivery State / City
Assam, Hojai
GeMARPTS Result
Not Specified
Ready to Proceed?
More Tenders You May Like
Portland Pozzolana Cement (Fly Ash Based) (V3) Conforming to IS 1489 (Part 1)
Male Coupler Skid Steer Loader,Female Coupler Skid Steer Loader,Fan Skid Steer Loader,Arm Rest Skid Steer Loader,Working Light Skid Steer Loader,Armature Skid Steer Loader,Fuel Filter Skid Steer Loader,Oil Filter Skid Steer Loader,Hydraulic Filter Skid Steer Loader,Horn 12V Skid Steer Loader,Joy Stick Head Skid Steer Loader,Amp Fuse Skid Steer Loader,Amp Fuse Skid Steer Loader,Amp Fuse Skid Steer Loader,Seat with Seat Bar Skid Steer Loader,Sensor,Seat Bar Bics Skid Steer Loader,Diode Kit Skid Steer Loader,Flasher Unit Skid Steer Loader,Gear Lever with Knob Skid Steer Loader,Relay Skid Steer Loader,Piston for Lift Arm Skid Steer Loader,Hose Size II Dozer BD 80,Hose Size II Dozer BD 80,Hose Size II Dozer BD 80,Hose Size II Dozer BD 80,Oil Filter Air Compressor,Fuel Filter Air Compressor,Hydraulic Filter Air Compressor
Fogging Machine (V2) as per IS 14855 (Part 1)
Pro: Deep AI Analysis
Get bid worthiness score, eligibility checklist, winning tips, and time-to-prepare estimate for this tender.
Upgrade to ProSummary information is processed by AI. Always refer to the official tender document for accurate dates, requirements, and legal specifics before bidding.