6A, 250V, 2 POLE, 2WAY WITH OF ROTARY SWITCH,ROTARY SWITCH 16A/440V KAYCEE,KAYCEE MAKE ROTARY SWITCH, 2 POLE, 2 WAY WITHOUT OFF, 10A,TERMINAL BLOCK 2.5 SQMM CLIP ON TYPE,DOOR LIMIT SWITCH,AEL WITH 6V 4 AH NICKEL METAL HYDRIDE BATTERY,TIMER EAPL A1D1-X 1NO+ 1NC,TRANSFORMER 100VA,VOLTMETER 0-500VA RED MARK AT 415V SIZE 96 X 96MM-SMI-96
AI Executive Summary
Supply of electrical items for Ministry Of Defence
Key Dates & Quantities
Bid Start Date/Time
18 Apr 2026, 02:26 pm
Bid End Date/Time
09 May 2026, 05:30 pm
Bid Opening Date/Time
09 May 2026, 06:00 pm
Bid Offer Validity / Contract Period
45 Days
Total Quantity
828
Pre-Bid Meeting Date
Not Applicable
Tender Details
Item Category
6A, 250V, 2 POLE, 2WAY WITH OF ROTARY SWITCH,ROTARY SWITCH 16A/440V KAYCEE,KAYCEE MAKE ROTARY SWITCH, 2 POLE, 2 WAY WITHOUT OFF, 10A,TERMINAL BLOCK 2.5 SQMM CLIP ON TYPE,DOOR LIMIT SWITCH,AEL WITH 6V 4 AH NICKEL METAL HYDRIDE BATTERY,TIMER EAPL A1D1-X 1NO+ 1NC,TRANSFORMER 100VA,VOLTMETER 0-500VA RED MARK AT 415V SIZE 96 X 96MM-SMI-96
Estimated Bid Value
₹0
ePBG Detail
0%
Bid Type
Goods
Is High Value
No
Qualifications & Experience
Years of Past Experience (with Govt.)
3 Year(s)
Project / Similar Work Experience Required
Not Specified
Minimum Average Annual Turnover
₹1 Lakhs
Additional Terms & Conditions
Refer to Tender Document (ATC section in PDF)
Preferences & Relaxations
MSE Preference
Applicable
MII Preference
Not Applicable
Startup Relaxation
Yes / Yes
MSE Turnover/Exp
Yes / Yes
Documents Required from Seller
• Experience Criteria • Past Performance • Bidder Turnover • Certificate (Requested in ATC) • OEM Authorization Certificate • OEM Annual Turnover • Compliance of BoQ specification and supporting document
Other Details
Consignees / Delivery Locations
4 Location(s)
Delivery State / City
Andhra Pradesh, Visakhapatnam
GeMARPTS Result
Not Specified
Ready to Proceed?
Pro: Deep AI Analysis
Get bid worthiness score, eligibility checklist, winning tips, and time-to-prepare estimate for this tender.
Upgrade to ProSummary information is processed by AI. Always refer to the official tender document for accurate dates, requirements, and legal specifics before bidding.