Skip to main content
Active

1 Point 5 HP Motor,Sand Bag,Tarpaulin Black 70x20,Water Pipe 1 Inch 30 Mtr,UTP Cable,Power Cable 10 Sqmm 4 Core Aluminum,Power Cable 6 Sqmm 2 Core Aluminum,15 Amp Socket with switch and Plug 15 Amp,LED Bulb 9 Watt,3 PIN Plug Male 05 Amp,Extension Board 4 Socket

Office: ***********

AI Executive Summary

Supply of 1 Point 5 HP Motor, Sand Bag, Tarpaulin Black 70x20, Water Pipe 1 Inch 30 Mtr, UTP Cable, Power Cable 10 Sqmm 4 Core Aluminum, Power Cable 6 Sqmm 2 Core Aluminum, 15 Amp Socket with switch and Plug 15 Amp, LED Bulb 9 Watt, 3 PIN Plug Male 05 Amp, Extension Board 4 Socket for Indian Army

Key Dates & Quantities

Bid Start Date/Time

19 Apr 2026, 12:48 am

Bid End Date/Time

29 Apr 2026, 01:30 am

Bid Opening Date/Time

29 Apr 2026, 02:00 am

Bid Offer Validity / Contract Period

60 Days

Total Quantity

849

Pre-Bid Meeting Date

Not Applicable

Tender Details

Item Category

1 Point 5 HP Motor,Sand Bag,Tarpaulin Black 70x20,Water Pipe 1 Inch 30 Mtr,UTP Cable,Power Cable 10 Sqmm 4 Core Aluminum,Power Cable 6 Sqmm 2 Core Aluminum,15 Amp Socket with switch and Plug 15 Amp,LED Bulb 9 Watt,3 PIN Plug Male 05 Amp,Extension Board 4 Socket

Estimated Bid Value

₹0

ePBG Detail

0%

Bid Type

Goods

Is High Value

No

Qualifications & Experience

Years of Past Experience (with Govt.)

0 Year(s)

Project / Similar Work Experience Required

Not Specified

Minimum Average Annual Turnover

₹0 Lakhs

Additional Terms & Conditions

Refer to Tender Document (ATC section in PDF)

Preferences & Relaxations

MSE Preference

Applicable

MII Preference

Not Applicable

Startup Relaxation

No / No

MSE Turnover/Exp

Yes / Yes

Documents Required from Seller

• BOQ Document • Technical Specification Document

Other Details

Consignees / Delivery Locations

4 Location(s)

Delivery State / City

Jammu And Kashmir, Rajouri

GeMARPTS Result

Not Specified

Ready to Proceed?

GeM Bid Document ID
Tender Document
EMD AmountNo EMD
Ends On29 Apr 2026, 01:30 am

Pro: Deep AI Analysis

Get bid worthiness score, eligibility checklist, winning tips, and time-to-prepare estimate for this tender.

Upgrade to Pro

Summary information is processed by AI. Always refer to the official tender document for accurate dates, requirements, and legal specifics before bidding.